Highway 11 Rehabilitation & Crocodile Creek Culvert Replacement

Location

Smooth Rock Falls, Ontario, Canada

Owner

Ministry of Transportation Ontario (MTO)

Role

Consultant

Project Overview

Rehabilitation of a 21.1 km section of Highway 11 to improve road quality and safety.

Key Components

  • Grading, Drainage & Granular Base – Enhancing roadway foundation and water management.
  • Hot Mix Paving – Multi-layer asphalt resurfacing to restore pavement structure.
  • Crocodile Creek Culvert Replacement – Major culvert replacement to ensure long-term drainage efficiency.
  • Englehart Patrol Yard Resurfacing & Structural Upgrades – Improving MTO’s maintenance facility.
  • Trenchless Culvert Replacements – Utilizing trenchless methods to minimize surface disruption.
  • Electrical Upgrades – Enhancements for improved roadway lighting and safety.
  • Roadside Safety Improvements – Guiderail replacements, drainage upgrades, and signage updates for better highway performance.

Challenges & Solutions

Project Impact & Benefits

  • Enhanced road durability and smoother driving conditions through full-depth pavement rehabilitation.
  • Improved drainage and culvert replacements to prevent roadway flooding and deterioration.
  • Safer highway infrastructure with guiderail replacements and updated signage.
  • Sustainable construction practices minimizing environmental impact and ensuring long-term road performance.